Concrete Slab Openings: Information for Planning the Work
Prepare the approved opening layout, access details and arrangements below the slab.
Concrete slab openings may be requested for service routes, stairs or lifts. Share the purpose of the opening together with the dimensions, floor level and known slab thickness. Stair and lift openings should be coordinated with the relevant supplier drawings.
The responsible engineer defines the structural requirements. The client arranges required approvals, specialist scanning and any engineered support. Work is not confirmed simply from a photograph of the marked opening.
Access below the slab matters as much as access above it. Identify the space underneath, how it can be isolated and who will handle lifting and removing the cut sections. Provide details of available power, water and scaffolding where required.
Share the complete scope through WhatsApp or email and arrange a site visit. Final price, method, sequence and scheduling depend on the confirmed site conditions and agreed responsibilities.
Arrange a site visit
Final scope, equipment and price are confirmed after reviewing the site. Available 24/7.